01 / Planning your project
Turn the brief into an agreed schedule.
For a building with many openings, we identify each window and agree the product, control arrangement, fabric and installation position. Room names and window references make it easier to check quotations and hand over the completed work.
Tell us about any required fire-performance evidence, cleaning method, access restrictions or control policy. Documentation is checked for the actual selected products; a general description such as “commercial fabric” is not a substitute for a specification.
02 / Planning your project
Plan fitting around the occupied building.
Reception areas, classrooms, treatment rooms and workspaces each bring different access and scheduling considerations. We discuss site induction, safe working arrangements and the sequence of rooms before agreeing the installation programme.
Electrical works, high-level access equipment, removal of old products and out-of-hours attendance need to be identified in the scope. We will explain what is included and what requires a separate allowance.