For a roof window, include the manufacturer's model code if available. For overhead or unusually wide glass, show the whole opening and the route needed to reach it. These details help identify suitable systems and the access equipment a survey may require.

If motors are proposed, agree the control method, power source and responsibility for any electrical work before ordering. A remote control, a wall switch and integration with a wider building system are different requirements and need to be included in the brief.