AdamsBlinds / Louvolite Commercial
Fabric performance data
Use the fabric cards to compare the properties that matter to your project. Read the entry for the chosen colour and construction, then confirm it against the building specification.
Talk to us about your project25 original manufacturer documents. Read the stated edition and confirm the specification for your quotation. Drawings do not indicate separate component sales.
Start with the required result
A screen, light-filtering cloth and blackout fabric solve different problems. Colour, weave and coating can also change how light and solar energy behave at the window. Use the figures for the actual finish rather than a range-wide assumption.
What the figures describe
Fabric width is the width of the supplied material. It is not a promise that a finished blind can be made to that width. Finished limits also depend on the tube, control, fabric weight, drop and installation.
A fire-test reference or treatment label applies to the material and conditions stated in the document. It does not establish that every complete blind configuration satisfies a particular building’s requirements.
Keep a record of the approved finish
Record the range, colour, compatible system and document edition in the project information. Ask for a physical sample where colour or surface texture is critical. We confirm availability and any sample charge before arranging it.
Let’s work through the details
Get a quote.
Plan your project.
Tell us which systems interest you, save a fabric shortlist or share your window schedule. We’ll help you agree the design, measuring, made-to-measure supply and professional installation you need.
- Free initial estimates by email or WhatsApp
- UK-wide supply and installation enquiries
- Made-to-measure supply-only enquiries welcome
Monday–Friday, 9am–5pm
Online enquiries at any time.
We aim to reply within 24 hours. Appointment dates and any specialist installation requirements are confirmed by our team.
